2K Industrial Marking HB



2K Industrial Marking HB

Application

The 2K Industrial Marking HB is ideal for lines, surfaces and symbols (VZ) in indoor areas with heavy traffic (forklift traffic) and which must be able to withstand being driven over very quickly.

Suitable substrates: Bituminous substrates* (mastic asphalt, asphalt concrete), concrete and cement-bound substrates.

* Large-scale application on asphalt surfaces in indoor areas is not recommended, as stress-related cracking may occur.

Product properties

» Quick-drying (can be loaded after 12 hours*)
» High wear resistance
» High coverage
» Clearly visible
» Suitable for forklift traffic
» Low sensitivity to dirt
» By adding the additive R (see TM), the slip resistance class R9 is achieved

*see Drying

Drying

(23°C, 60% relative humidity)
Hardening time: approx. 60 minutes
Can be painted over: after approx. 2 hours
Walkable: after approx. 5 hours
Suitable for forklift traffic: after 12 hours

The drying time depends on the wet film thickness, temperature, humidity and the material and ceiling temperature. Only open the roadways to traffic after the contractor has checked that they are completely dry.

Spreading rate

Actual consumption depends on the applied layer thickness, the application method and the nature of the substrate.

For more information, see the Technical Data Sheet.

Type of application

Roll and spray

Shade

Colours in stock:

Traffic white RAL 9016
Traffic yellow RAL 1023

Colours shades developed, custom-made:

Traffic white, approx. RAL 9016
Traffic yellow, approx. RAL 1023
Traffic orange, approx. RAL 2009
Oxide red, approx. RAL 3009
Tomato red, approx. RAL 3013
Traffic red approx. RAL 3020
Light blue, approx. RAL 5012
Sky blue, approx. RAL 5015
Traffic blue, approx. RAL 5017
Grass green, approx. RAL 6010
Yellow-green, approx. RAL 6018
Traffic green, approx. RAL 6024
Anthracite grey, approx. RAL 7016
Concrete grey, approx. RAL 7023
Stone grey, approx. RAL 7030
Traffic grey A, approx. RAL 7042
Traffic grey B, approx. RAL 7043
Red-brown, approx. RAL 8012
Traffic black, approx. RAL 9017

Delivery time approx. 8–10 working days.

Additional RAL colors: Upon request. Delivery time approx. 15–20 working days.

Field of application

Indoors

Package size

5 kg base coat + 1 kg hardener
10 kg base coat + 2 kg hardener (on request)
20 kg base coat + 4 kg hardener (on request)
30 kg base coat + 6 kg hardener (on request)